Pavilion, outdoor kitchen & stone fireplace
Scope: footings · roof framing · cedar ceiling · masonry · grill & bar · TV wall · fan & lighting

Ceiling install in progress
Scope: T&G ceiling · beam work · in progress

Wide-tread stairs & railing system
Scope: cut stringers · PT treads · post & baluster rail · site supervisor pictured

Covered rear entry addition
Scope: framing · sheathing · roof tie-in · siding match
More project photos added as jobs wrap · Follow along on Facebook
Typical scope
What a job like this involves.
Homeowners are usually surprised by how much happens before anything looks finished. Here is the honest order of operations on a covered outdoor living build.
- 01
Layout & footings
Locate the structure, check grade and drainage, dig and pour footings sized for the roof load, and pass the footing inspection.
- Permit on file
- Footing inspection
- 02
Posts, beams & roof framing
Set posts, hang beams, frame rafters and sheathe the roof. This is where the shape of the thing finally shows up.
- Framing inspection
- Dried in
- 03
Rough-in
Electrical for fans, cans, outlets and TV; gas and water for the kitchen. All of it before the ceiling and veneer close things up.
- Licensed subs
- Rough-in inspection
- 04
Ceiling, masonry & finish
Tongue-and-groove ceiling, stain, stone veneer, countertops, appliances, fixtures, trim and paint. Then cleanup and walkthrough.
- Final inspection
- Punch list closed